Experimental equipment is different from industrialized mass production equipment and needs to face experimental requirements for a variety of materials, or different particle size of the same material. When using operations, if there are different materials or different particle size, it is necessary to thoroughly clean the equipment to ensure that the material or particle size is not intertwined with each other, avoiding inaccurate experiments, and ensuring the objectivity of the experimental data. At the same time, experimental equipment also has a large difference in operating personnel and operating environment. The dedicated series of equipment in this laboratory is divided into four categories: laboratory laboratory air crushing machine (laboratory air crusher), laboratory air flow grading machine, laboratory impact grinding, and laboratory inert gas protection crusher.

\u0026emsp;\u0026emsp;实验室气流粉碎机的使用范围非常广泛,在化工、矿物、冶金、磨料、陶瓷、耐火材料、医药、农药、食品、保健品、 You can see the body of the laboratory air flow crusher in the new material industry, so do you know the operation steps of the laboratory air flow crusher? This is a very important link. It is related to the life of the subsequent equipment, the incidence of faults, and the smooth production. The following editor of Youmingke will introduce the operation steps of the laboratory airflow crusher. \u0026 emsp; \u0026 emsp; laboratory air flow crusher and whirlwind separator, dust collector, and induction unit form a whole set of crushing systems. After the compressed air is filtered and dried, it is sprayed into the crushing cavity at a high speed through the Rawar nozzle, and the materials at the intersection of multiple high -pressure airflows are repeatedly collided, rubbing, cutting and crushing. Under the strong corporal effect of the high -speed rotating hierarchical turbine, the thick and thin materials are separated by the high -speed rotating turbine. The fine particles that meet the particle size requirements enter the cyclone separator and the dust collector through the hierarchical wheel. Essence \u0026 emsp; \u0026 emsp; 1. Preparation before booting \u0026 emsp; \u0026 emsp; check whether the host, connecting machine, pipeline and valve are in a good state and can work properly. \u0026 emsp; \u0026 emsp; 2, boot \u0026 emsp; \u0026 emsp; (1) Open the power supply of the compressor, the dust collector pressure valve and the main gas valve, turn on the power switch of the airflow grinding machine, and turn on the power switch. \u0026 emsp; \u0026 emsp; (2) starting from scratch and gradually adjusting it to the specified speed. \u0026 emsp; \u0026 emsp; (3) Open the fan, whirlwind separator, dust removal, charging motor power, turn on the total power box, set the frequency of the inverter, and then start charging. \u0026 emsp; \u0026 emsp; (4) The particle size of the finished product can be adjusted according to the frequency and loading capacity of the hierarchical wheel. \u0026 emsp; \u0026 emsp; 3. The order of stopping the stop is: inverter-feeder-main air air valve-compressor-grade impeller-cyclone material, dust removal switch-fan-total power-air compressor. \u0026 emsp; \u0026 emsp; 4. Maintenance \u0026 emsp; \u0026 emsp; (1) The motor should be lubricated regularly, but lubricating oil should not be excessive to avoid excessive temperature of the bearings. \u0026 emmSP; \u0026 emsp; (2) It is important to check the wear of impeller, spiral conveyor and broken nozzle. \u0026 emsp; \u0026 emsp; (3) After the material is crushed, the rubber powder in the machine should be cleaned to avoid blocking and affect the crushing effect. \u0026 emsp; \u0026 emsp; (4) After the filter bag is used for a period of time, it should be cleaned or replaced. \u0026 emsp; \u0026 emsp; 5. Note \u0026 emsp; \u0026 emsp; (1) Unloading equipment cannot be reached when the unloading export is unloaded to avoid accidents. \u0026 emsp; \u0026 emsp; (2) The speed of the impeller cannot exceed the regulations, otherwise the temperature will be too high and damage the impeller and motor. \u0026 emsp; \u0026 emsp; (3) The safety valve should be checked regularly to ensure safety. \u0026 emsp; \u0026 emsp; above is the operation steps and some precautions of the laboratory air flow crusher. What do you see? Qingdao Youmingke Fan Machinery Machinery has made crushing airflow and hierarchical equipment for more than 23 years. He has more than 20 technical intellectual property rights and rich research and development and production experience. At the same time, Yumingke loves Pink Sports Technology with its own strong quality and good market reputation, and has also gained the favor of more and more new customers. According to the different needs of cars, companies and other companies have chosen Yimingke's various series of airflow crusher products under the various series of airflow crushing machines.