The modern production base of Youmingke Fan Machinery is located in the charming Shandong of the manufacturing industry. Thanks to the policy support of the traditional manufacturing industry and the congenital resource conditions of the traditional manufacturing industry, the scale of the production of Powder Machinery Machinery continuously expanded. A number of advanced automated production lines such as snake -shaped pipe production lines, membrane wall production lines, CNC disc production lines, and informatized production management systems, which have constituted a large -scale, specialized, intelligent airflow crushing Machine production base.
How much is the large -scale micron straw fiber microfilling mechanical equipment, aluminum silicate is a kind of silicate, and the chemical formula is Al2Sio5. Because the structure of most silicate is very structured The form of complex, often not written as salt, is written in the form of metal's respective oxides, so aluminum silicate is often written as Al2O3 \u0026 Middot; SiO2. The density of aluminum silicate is 2.8 to 2.9 grams/cubic centimeter, and the refractive index is 1.56. Its Mohs hardness is related to the type of ore, and the moisture content is related, changing between 4.5 and 7.5. Aluminum silicate powder is commonly used as fire prevention materials, such as using glass kiln in the glass industry.
Case of Youmingke Steel Standard ITC300 vertical air flow grading machine: The customer is a steel residue re -use technology company in Xi'an. Through materials, the ITC300 vertical airflow classifier of Our Famous Powder Machinery has reached customer needs. Product particle size: D80: 23.4 Out of yield: 175kg/h Successful acceptance: Youmingke installation engineers will guide the installation and debugging equipment throughout the process until the entire production line will be successfully met. Installation preparation phase: look at the components required for confirmation of ordering orders and counting equipment, and measure the elevation, geometric size and other measurement according to the drawings; the equipment installation stage: conduct on -site installation and planning according to the design drawing, gradually start installing equipment and related supporting facilities; Phase: Further check the equipment and perform debugging and maintenance before use to ensure that the operating characteristics of the equipment meet the needs of production; Equipment acceptance stage: Youmingke is responsible for training relevant personnel. Qualified letters.